Steel Mezzanines
- Stage completed
- Location Pieńków 149, 05-152 Czosnów k/W-wy
- Size 250 m²
Scope of work
Building permit design of the structure.
Project description
As part of the planned alteration of the existing sports hall in Pieńków, a steel mezzanine was designed on a circular plan, together with steel stairs. In addition, a structure separating the women's and men's changing rooms, including sanitary facilities, was designed, along with a separate steel structure partitioning off sanitary facilities from the existing storage rooms, both on a rectangular plan. One of these structures is directly connected to the designed steel mezzanine.
Client
KM Rubaszkiewicz Sp. z o.o.