Projects

Municipal Utilities Facility

Municipal Utilities Facility

  • Stage completed
  • Location ul. Lwówecka 8, Lubań
  • Size 1700 m²
Scope of work

Detailed design and workshop documentation of the steel structure and foundations.

Project description

The project involved the construction of a steel shelter for the extension of the Regional Municipal Waste Processing Facility in Lubań, including a Preliminary Selective Waste Segregation Point. The shelter is founded on reinforced concrete pad footings. The detailed and workshop calculations and model were prepared in 3D. The comprehensive detailed and workshop documentation was generated directly from the model, avoiding drafting errors.

Client

MIKOBUD Z.U.P. Tadeusz Fafiński

< Back

×

Essential Cookies

These cookies are necessary for the website to function and cannot be turned off. They are used, for example, to maintain the contents of the user's basket. You can set your browser to block these cookies, but then the website will not function prope

Always active

Analytical cookies

These cookies allow you to count visits and traffic sources. Thanks to these files, it is known which pages are more popular and how the website visitors navigate. All information these cookies collect is anonymous.