Municipal Utilities Facility
- Stage completed
- Location ul. Lwówecka 8, Lubań
- Size 1700 m²
Scope of work
Detailed design and workshop documentation of the steel structure and foundations.
Project description
The project involved the construction of a steel shelter for the extension of the Regional Municipal Waste Processing Facility in Lubań, including a Preliminary Selective Waste Segregation Point. The shelter is founded on reinforced concrete pad footings. The detailed and workshop calculations and model were prepared in 3D. The comprehensive detailed and workshop documentation was generated directly from the model, avoiding drafting errors.
Client
MIKOBUD Z.U.P. Tadeusz Fafiński