Boltek Terminal - Main Pipebridge
- Stage completed
- Location Boltek Tank Terminal, Rotterdam
- Size 95 t
Scope of work
KMT carried out the detailed workshop design of the steel substructure for the pipebridge, together with the connection calculations. The project was carried out in BIM technology using Tekla Structures software.
Project description
The investment involves the construction of a new gas terminal in Rotterdam.
Client
Poner Sp. z o.o.